On Tue, 31 Aug 2004 15:59:08 -0400, "BW"
wrote:
I finally got moved into my new house and the machines are nestled into the
garage. I have to move the lathe and bridgeport into the cellar. I have a
walk-in door to the basement but the problem is getting the stuff to the
door. There is about 40' of grass to move the stuff over. I moved the
bridgeport head and table on a skid by using rollers under it. It was quite
a job. I am leery of trying to move the base the same way. Any suggestions
on moving the base ? There is not enough room to get a large machine in to
carry it.
Thanks,
Bill W
Two sheets of 3/4" plywood. Lay the far one under the one the mill is
on. Push to the new sheet, remove the old one, pry up the far end,
stick the new sheet under the one the mill is on, move to this sheet
and repeat. Takes more time to explain than to do.
Gunner
"In my humble opinion, the petty carping levied against Bush by
the Democrats proves again, it is better to have your eye plucked
out by an eagle than to be nibbled to death by ducks." - Norman
Liebmann
|