View Single Post
  #2   Report Post  
Ed Sirett
 
Posts: n/a
Default Vaillant Combi Boiler

Giff wrote:

Ed Sirett wrote in message ...


Generally there is LN&E and another three terminals marked 3,4&5.
Heating 'go' is done by connecting the mains on terminal 3 to terminal
4, terminal 5 is an extra neutral for devices that need it.

External timers go in series with the thermostat.


Just opened it up. Looks like the guy who came to fix it actually
disconnected the wires from the timer that would control the on/off
heating. What he's done is put a loop between pins 3 and 4. I assume I
could remove that loop, add the L from the heating control into 4, the
N into the same mains N connection. This should mean that the power to
the heating should only come on when the switch is made on the timer.
Is this right? I know I'm probably asking some daft questions but I'm
a bit of a first timer at boilers.
Thanks for your help


The 3,4 link should mean the boiler runs the heating all the while (when
the summer/winter switch is put to

This is very basic electrics really: if 3 is connected to 4 the boiler
runs the heating.
You might well find that simply connected the mains to 4 will also do
the same, but is best avoided since you might get odd effects.
If you want thermostat as well you will take the switched output from
the timer and connect to terminal 4 via the thermostat.

The timer should get its power from the L&N direct from the mains and it
should conect 3&4 togther to make the heating run.


--
Ed Sirett - Property maintainer and registered gas fitter.
The FAQ for uk.diy is at www.diyfaq.org.uk
Gas fitting FAQ http://www.makewrite.demon.co.uk/GasFitting.html
Sealed CH FAQ http://www.makewrite.demon.co.uk/SealedCH.html