View Single Post
  #4   Report Post  
ameijers
 
Posts: n/a
Default Need Info on Live in Basement Plans


"Eric Tonks" etonks@sunstormADD-DOT-COM wrote in message
isi.com...
Was commonly done in the late 40s and early 50s. Some people never got

past
the basement, and the upper floors were never completed. Now most
authorities and all mortgage companies will not allow this to be done.

Building on top of a roofed basement is not easy, and the elements keep
leaking through untill the upper floors are sealed. This is one reason

many
people never advanced this far.

I concur. Seen plenty of 20 year old follies like that in my search for a
house. A much better solution, IMHO, is to buy or lease a used mobile, and
spot it on the property, and live in that while you build. Even in areas
where zoning doesn't allow mobiles, you are usually allowed to use them for
temporary shelter as long as construction is actively underway. Livable used
mobiles can be had for 5-10 K, and as long as they aren't trashed out, can
usually be sold for about as much 12-24 months later. Put the septic and
well in first, size them for the house, but add a second set of connections
for the mobile.

Make sure you have cash in hand or a commitment from the bank before you
start. Most places will NOT write paper for owner-built unless they are
convinced the owner has the skills and time to actually produce a house
worth close to what they are loaning. A set of building plans, pulled
permits, etc, go a long way to prove you aren't just a dreamer.

aem sends....