View Single Post
  #14   Report Post  
Posted to uk.d-i-y
alan_m alan_m is offline
external usenet poster
 
Posts: 5,774
Default Time for re-design?

On 20/04/2021 14:20, Dave Plowman (News) wrote:
In article ,
JohnP wrote:
Pet hate is the back box for sockets and switches. The way of cramming in
the cables is crude. Especially as if you change a fitting the termianls
can be in a different configuration.


Never had a problem with a decent size box and leaving adequate length
tails. Some seem to think cable costs a fortune, so try and save every
inch.


My mother's house was built in the 1960s and all the wiring in that
property is stretched within a inch of its life - no slack anywhere.
Remove a ceiling rose and you are in trouble as the wire tries to shrink
back into the ceiling. Remove a wall socket and it will come forward
just enough to get a screwdriver in to the terminals, and if replacing
the socket one with a similar connection location has to be purchased.

--
mailto : news {at} admac {dot} myzen {dot} co {dot} uk