View Single Post
  #31   Report Post  
Posted to uk.d-i-y
polygonum_on_google[_2_] polygonum_on_google[_2_] is offline
external usenet poster
 
Posts: 922
Default Side road resurfacing

On Friday, 19 March 2021 at 13:02:16 UTC, undefined wrote:
Originally concrete slab, later tarmaced. They are resurfacing and have
scrapped up the tarmac down to concrete - how long do they normally
leave it, before returning to retarmac?

It's been two weeks now.


Where I live, we had well laid roads but, because building of other properties continued, the final surface was not laid until a few months back it was the subsurface. Thus the lowered kerbs, ironworks, etc., presented a bit of a lump and required care.

They have now done the final surface, a lovely job in fine tarmac.

But the oddity is that I use a wifi relay and, since the final surfacing, it has improved transmission - from typically about 90% to almost always 100% as the unit shows. No other changes at all.

No relevance to anything else. Just my observation.