Default Side road resurfacing

That was maybe because the underlying concrete was level and not too many
issues about inspection covers and drains or damage to the concrete from
past excavations.
Brian

--

This newsgroup posting comes to you directly from...
The Sofa of Brian Gaff...

Blind user, so no pictures please
Note this Signature is meaningless.!
"Andrew" wrote in message
...
On 19/03/2021 13:08, jon wrote:
On Fri, 19 Mar 2021 13:02:12 +0000, Harry Bloomfield, Esq. wrote:

Originally concrete slab, later tarmaced. They are resurfacing and have
scrapped up the tarmac down to concrete - how long do they normally
leave it, before returning to retarmac?

It's been two weeks now.


They could leave it, we have some concrete roads around here.


Local station car park and the entrance has just been done for
Southern Rail. Planed off the entrance road down to concrete on day 1
and the whole job was finished by day 3.