View Single Post
  #10   Report Post  
Posted to uk.d-i-y
alan_m alan_m is offline
external usenet poster
 
Posts: 5,774
Default Side road resurfacing

On 19/03/2021 13:02, Harry Bloomfield wrote:
Originally concrete slab, later tarmaced. They are resurfacing and have
scrapped up the tarmac down to concrete - how long do they normally
leave it, before returning to retarmac?

It's been two weeks now.



Possibly waiting for the weather forecast to tell them the temperature
is going to be above xC or that the concrete surface will by dry for y
hours.

--
mailto : news {at} admac {dot} myzen {dot} co {dot} uk