View Single Post
  #2   Report Post  
Posted to uk.d-i-y
jon jon is offline
external usenet poster
 
Posts: 434
Default Side road resurfacing

On Fri, 19 Mar 2021 13:02:12 +0000, Harry Bloomfield, Esq. wrote:

Originally concrete slab, later tarmaced. They are resurfacing and have
scrapped up the tarmac down to concrete - how long do they normally
leave it, before returning to retarmac?

It's been two weeks now.


They could leave it, we have some concrete roads around here.