Side road resurfacing
On Fri, 19 Mar 2021 13:02:12 +0000, Harry Bloomfield, Esq. wrote:
Originally concrete slab, later tarmaced. They are resurfacing and have
scrapped up the tarmac down to concrete - how long do they normally
leave it, before returning to retarmac?
It's been two weeks now.
They could leave it, we have some concrete roads around here.
|