On 19/02/2020 16:58, tony sayer wrote:
Course a lot of digging for higher capacity cabling and distribution
system alternation to be made but looks like the power industry might be
a good career choice
Around my way a lot of roads are closed for 6 weeks at a time while the
gas pipes are replaced or re-lined. This has been going on for a couple
of decades. If a majority of roads in towns have got to be dug up for
additional electric supplies connected to road side metres how long is
it going to take to complete the work?
--
mailto : news {at} admac {dot} myzen {dot} co {dot} uk