On Fri, 20 Dec 2019 19:03:44 -0600, dpb wrote:
On 12/20/2019 5:39 PM, Sonny wrote:
On Friday, December 20, 2019 at 10:42:40 AM UTC-6, dpb wrote:
The hardest part of the job might be carrying the boards the half mile distance.
Looks big enough to bring the Gator along behind...
For a moment I had thought about the pulling of a small trailer behind the 4-wheeler (Gator), but you'd be good for only 1 one-way trip. You couldn't turn around nor back up very well to get subsequent loads on that narrow winding path.
Compared to hand-carrying, I'd find a way...
Horse, mule, goat, large dog . . .
I don't like to carry stuff by hand that can easily be carried by
machine either, but I recognize that that says more about me than it
does about the feasibility of a project. The Pyramids were built
without a single piece of powered machinery.