View Single Post
  #1   Report Post  
Posted to uk.d-i-y
GB GB is offline
external usenet poster
 
Posts: 4,768
Default Boiler PCB Repair - Part II

The parts Geoff needed apparently didn't turn up yesterday, and he
closed at noon today for 10 days.

It's the same temperature inside the house as outside, but fortunately
the weather forecast is for daytime highs of as much as 8C.