View Single Post
  #8   Report Post  
Posted to rec.woodworking
Leon[_7_] Leon[_7_] is offline
external usenet poster
 
Posts: 12,155
Default Drying walnut slabs

On 5/8/2019 11:36 PM, Gramps' shop wrote:
I came into three 8/4 walnut slabs today. Moisture meter reads 30%. How long can i expect it to take to get,to 10% or so if I stick stack them outdoors? I am going to see if there is a local kiln service, but I suspect they may want more than the $1.50/bf I paid for this. Like to work these before I forget why I bought them 😜


General rule of thumb is 1 year per 1" of thickness.