View Single Post
  #1   Report Post  
Posted to rec.woodworking
Gramps' shop Gramps' shop is offline
external usenet poster
 
Posts: 269
Default Drying walnut slabs

I came into three 8/4 walnut slabs today. Moisture meter reads 30%. How long can i expect it to take to get,to 10% or so if I stick stack them outdoors? I am going to see if there is a local kiln service, but I suspect they may want more than the $1.50/bf I paid for this. Like to work these before I forget why I bought them 😜