On 02/05/2019 13:03, Steve Walker wrote:
On 02/05/2019 10:25, The Natural Philosopher wrote:
On 02/05/2019 10:09, Steve Walker wrote:
The Hinkley point power station is hugely over budget and late. And
may never be completed.

Agreed. Which is why we need to produce one design that incorporates
all the latest knowledge on contruction, use and decomissioning and
roll them out - as France did.


That wont fix the problem of over regulation designed to strangle
nuclear power.


No, but it does mean only one set of design documents, operation docs
and safety case docs - the vast majority of which need not be reviewed
for the next reactor, as long as the design remains the same.


And yet they are. Every time.

And again halfway through construction when the rules change, Again.




--
"The most difficult subjects can be explained to the most slow witted
man if he has not formed any idea of them already; but the simplest
thing cannot be made clear to the most intelligent man if he is firmly
persuaded that he knows already, without a shadow of doubt, what is laid
before him."