replying to ShadowTek, Wally wrote:
I'm facing the same issue. Building a frame for mesh (1/2 in) with 2x4 is not
difficult. I suggest using 2-2x4's connected at the bottom of the frame to
keep it off whatever you've set it on. Buying the material and assembling
this should not take you more than a day. It will be easy to dump the gravel
out of the frame after washing it onto an area where you can let it dry.
--
for full context, visit
https://www.homeownershub.com/mainte...el-478656-.htm