On Fri, 5 Oct 2018 07:42:47 +0100, Andy Burns wrote:
SMETS1 meters must either be upgraded to enable portability, or replaced
with SMETS2 meters by the end of 2020, about 1/3 of existing SMs are
expected to need replacing.
I wonder what that will do to the cost/benefit figures.
The document quotes 5.7 billion to 2030 when last done in 2016 so
presumably excludes the costs of this SMETS1 to 2 upgrade. 5.7
billion from 2016 to 2030 is only 380 million/year...
The next cost/benefit is due in 2019.
--
Cheers
Dave.
|