Thread: Crack problem
View Single Post
  #26   Report Post  
Posted to uk.d-i-y
Andy Burns[_13_] Andy Burns[_13_] is offline
external usenet poster
 
Posts: 7,829
Default Crack problem

wrote:

What the pic doesn't show is that the crack stops above & below that
section, and I hadn't noticed that it's right in line with the pipe
fixings.

While you've got the mortar raked out, insert some flat
(stainless?/galvanised?) steel bar above/below the cracked section?