View Single Post
  #10   Report Post  
Posted to uk.d-i-y
Dave Plowman (News) Dave Plowman (News) is offline
external usenet poster
 
Posts: 43,017
Default Earth Sleeving for 10mm T+E?

In article ,
dennis@home wrote:
On 10/05/2018 14:58, Dave Plowman (News) wrote:
In article ,
jkn wrote:
Well ... I have currently got the incoming and outgoing earths twisted
together for a length (2--3 inches), and I doubt it will fit that. I was
hoping not to have to separate them and have them joined in the screw
terminal. But if that is what people do, fair enough...


Twisting together then fitting sleeving over both doesn't insulate the
earth properly, as it will still be exposed at the sheath end.


Do you insulate the metal boxes they connect to?


The idea of the sleeving is to minimise the possibility of a short. And
the end of the outer sheath is often nicely positioned to catch a
terminal. Twisting earths together all their length also makes it more
difficult to 'page' the runs neatly. But carry on doing this if you are
too mean to pay for more lengths of sleeving.

--
*I took an IQ test and the results were negative.

Dave Plowman London SW
To e-mail, change noise into sound.