View Single Post
  #4   Report Post  
Posted to uk.d-i-y
ARW ARW is offline
external usenet poster
 
Posts: 10,161
Default Builders and electrics

On 21/04/2018 17:09, wrote:
On Saturday, 21 April 2018 15:38:54 UTC+1, ARW wrote:
So they need to remove some lights to take down a ceiling at a school.


That would be covered by a full Method Statement and Risk Assessment, then.


Indeed not:-). Things would have been taken further if I had not lied
for the builders "loose connection in the light fitting that they caught
with their ladders guv".

Actually I was the only one to get into trouble that day. I went to the
the DB to turn the power back on without an escort (this is a working
primary school).

--
Adam