Thread
:
Builders and electrics
View Single Post
#
4
Posted to uk.d-i-y
ARW
external usenet poster
Posts: 10,161
Builders and electrics
On 21/04/2018 17:09,
wrote:
On Saturday, 21 April 2018 15:38:54 UTC+1, ARW wrote:
So they need to remove some lights to take down a ceiling at a school.
That would be covered by a full Method Statement and Risk Assessment, then.
Indeed not:-). Things would have been taken further if I had not lied
for the builders "loose connection in the light fitting that they caught
with their ladders guv".
Actually I was the only one to get into trouble that day. I went to the
the DB to turn the power back on without an escort (this is a working
primary school).
--
Adam
Reply With Quote
ARW
View Public Profile
Find all posts by ARW