Thread: Condensate
View Single Post
  #31   Report Post  
Posted to uk.d-i-y
Jim Jim is offline
external usenet poster
 
Posts: 2,176
Default Condensate

Wrote in message:
On Sat, 03 Mar 2018 16:31:43 +0000, Tim Streater
wrote:


http://www.ipswichstar.co.uk/news/ip...ng-rail-servic
es-to-a-halt-1-5417520

Couldn't they just push a suitably customised wagon through that lot?

And then find that where the ice was close or had formed around the
components of the overhead power lines attached to the tunnel roof you
have knocked them out of alighment or even dragged them down creating
really long delays while they get repaired.

Not a very practical suggestion.


So how do two blokes in orange anoraks deal with the issues you
imagine?



But carry on choosing between starting to Troll or not having any
common sense.


In the case of the Sussex tunnel there would be no overhead lines. It's
all third rail.


That as maybe but Jerk was commenting on the photo in the Ipswich Star
link of a Tunnel at Ipswich which does have overhead lines.


Who's trolling now "dum****-egg"?

(snip begrudging acknowledgement with Googled specific examples of
use of methods other than two blokes with a long stick poking at
icicles)....

--
Jim K


----Android NewsGroup Reader----
http://usenet.sinaapp.com/