View Single Post
  #18   Report Post  
Posted to uk.d-i-y
ARW ARW is offline
external usenet poster
 
Posts: 10,161
Default OT HS2 site entrances and muddy roads?

On 21/02/2018 22:32, The Other Mike wrote:
On Tue, 20 Feb 2018 20:07:49 +0000, ARW wrote:

The sites are too far apart for that. The site entrances cover Brierly
to Hampole but the site entrances are not linked together ie each site
is an individual site.


Confirmed it's the 400kV line from Thorpe Marsh to Stalybridge.

Conductor replacement.

End of works is around September


An expensive rewire.

--
Adam