View Single Post
  #2   Report Post  
Posted to uk.d-i-y
Cursitor Doom[_4_] Cursitor Doom[_4_] is offline
external usenet poster
 
Posts: 2,783
Default Grid's a bit iffy

On Fri, 05 Jan 2018 16:46:19 +0000, Tim Watts wrote:

http://www.gridwatch.templar.co.uk/

It's at 45GW and climbing - but we are 3 reactors down according to:

https://www.edfenergy.com/energy/pow...daily-statuses

Sizewell B is planned, but Hartlepool and Hunterston B both have 1/2
reactors tripped out and the latter is marked as "return on 12th".


I prefer NP's Gridwatch.



--
This message may be freely reproduced without limit or charge only via
the Usenet protocol. Reproduction in whole or part through other
protocols, whether for profit or not, is conditional upon a charge of
GBP10.00 per reproduction. Publication in this manner via non-Usenet
protocols constitutes acceptance of this condition.