On 04/01/2018 15:36, Andy Burns wrote:
The Natural Philosopher wrote:
cost of repairing overhead 11KV fault. £2000.
Cost of undergrounding it - £30,000 per kilometer.
£250m for 8 miles in Stratford
https://www.arup.com/projects/london-2012-powerlines-undergrounding
Not 11 kV though: 132 and 400 kV.
A bit more detail here
http://www.icevirtuallibrary.com/doi....2011.164.6.11
Tunnels were 4.15 and 2.8 metres diameter.
I guess trenched undersea cables are much more lossy. It would be
interesting to know at what point it becomes worth going to DC.