Thread: R. Cott. 26
View Single Post
  #1   Report Post  
Posted to uk.d-i-y
Tim Lamb[_2_] Tim Lamb[_2_] is offline
external usenet poster
 
Posts: 6,938
Default R. Cott. 26

Right. Floor heating pipe ready for screeders!

Next issue is fixed load (kitchen units) on 18mm chip over 40mm PIR
foam.
The heating system suppliers recommend stiffening the floor (insert
suitable batten) where the load will bear. Kitchen designers pooh pooh
this as unnecessary. The kitchen units are on site so not impossible to
measure. Not actually feet but a circular bearer near each corner of a
600mm unit.

Any thoughts?
--
Tim Lamb