Default Under shower stall backerboard-- visquine?


"AnnG" wrote in message
...
JimC622911 wrote:

I'm ready to tackle my new shower. Right now I've got 6 by stud walls

and
insulation (no sheetrock). I'm putting up 1/2 backerboard then tile.

Do I
need to put some sort of waterproof layer under the backerboard, such as
plastic sheeting, or can the backerboard be screwed directly to the

studs? I'm
sure this has been addressed before, but-- any compelling reason to

chose
concrete backerboard over Hardiebacker?


6X? Is that 2X6 studs?

There's not enough detail in your post to give you any specific advice.
Stall shower? Tub shower? Plastic shower pan? Tile shower pan?

I will say this, you should at least have drywall behind the tile board
to stiffen it and give it density.


you have got to be kidding me AnnG (drywall behind the tile board)
and you have the nerve to correct others in here.

get back in the field and out from behind your desk!



Tile does not flex well.


well....duh!


If you
bump into that flimsy wall between the studs you'll see what I mean.


just like walking on a floor where the backerboard does NOT land on a joist.
right AnnG...................that's what I thought.