Fukushima clear up costs double. AGAIN
On 20/12/16 19:39, Jaffna Dog wrote:
Flooding of switchgear doesn't have to mean a shutdown, they just needed to disable the earth-leakage and overcurrent trips, and supply would have been maintained.
The electric motors ran flooded until the batteries ran out.
The diesels were flooded.
|