On Sat, 20 Feb 2016 17:40:48 -0600, Ignoramus31598
wrote:
On 2016-02-20, Gunner Asch wrote:
On Sat, 13 Feb 2016 10:40:38 -0600, Ignoramus2527
wrote:
Either unit should carry it...nor neither should. And having that
cable on only (1) set of lifting lugs on one side of that motor
means that if you blow a line on the forklift..and the forks
drop..that sling will roll the motor over on top of the operator
before you can say ****!!
Why, there is a mast between them.
That mast will simply make it harder for the coroner to drag the body
out of the smashed cage.
I know enough, by now, not to believe this B/S
i
http://www.google.com/url?sa=t&rct=j...6ewk6jwXvtLojw
http://www.google.com/url?sa=t&rct=j...AOTma84Xo-I8Pg
https://www.google.com/search?q=crus...t+mast+failure
Dynamic loading..remember?
32 feet per second, per second.
How much does that 38k lbs weigh when trying to stop it from a 2 foot
fall? 4 foot fall? 6 foot fall?
Gunner