Thread: Vapor Intrusion
View Single Post
  #1   Report Post  
Posted to alt.home.repair
[email protected] seo.golars@gmail.com is offline
external usenet poster
 
Posts: 1
Default Vapor Intrusion

For the vapor interruption pathway to be finished, there must be three parts--a wellspring of unpredictable mixes in the subsurface environment (groundwater and/or soil), occupied structures on the other hand the potential for future occupied structures, and a movement course to associate them (as talked about above).


http://www.golars.com/vapor-intrusion.html