View Single Post
  #5   Report Post  
Posted to uk.d-i-y
Mike Tomlinson Mike Tomlinson is offline
external usenet poster
 
Posts: 4,069
Default Island uses combined hydro and wind power to generate electricity

En el artículo 1510559666465725946.688418timdownie2003-yahoo.co.uk@news
..eternal-september.org, Tim+ escribió:

More like 20km, not 200.


ps. if it really were 20km, they would have some difficulty operating
inter-island flights

https://www.bintercanarias.com/

Flights between el Hierro Valverde (VDE) and Tenerife Norte (TFN) take
40 minutes, between TFN and la Palma (SPC) 30 minutes. I've flown
between the various islands so many times I've lost count.

--
(\_/)
(='.'=) Bunny says: Windows 10? Nein danke!
(")_(")