415V sticker in household meter box
On 29/08/2015 19:48, Fredxxx wrote:
On 29/08/2015 16:35, newshound wrote:
If you hacksaw into it, you might be able to see how many conductors
there are.
Report back when you've counted them.
I think I asked a perfectly reasonable question. Adam seemed to be
asserting that the cabling was there to the board, which surprised me a
little.
Apologies, I initially thought I was reply to woosyguy's post!
To be honest the only way you could tell would be from the size of the
cable entering the building and it's type and rating.
I would have thought each phase would have been properly terminated and
not just cut.
No problem. There's no obvious writing on my incomer. It goes into a PME
box which looks big enough to terminate two spare phases. It would be
trivial to open it, but I have no need for 3 phase or more than 100
Amps, I was just interested.
|