View Single Post
  #29   Report Post  
Posted to alt.home.repair
TimR[_2_] TimR[_2_] is offline
external usenet poster
 
Posts: 1,526
Default Electric Panel Question - two v one panels

On the other hand, if your pool panel is fed after the meter but before the exterior disconnect, then I think you're probably in violation or at least unsafe.

But it seems to me it would have been easier to install after that disconnect, otherwise you'd be working hot or have to pull the meter.