EDF closes 4 nuclear reactors
On 13/08/14 09:14, Mike Tomlinson wrote:
In article , The Other Mike
writes
Could come to nothing,
but given similar operating hours, the severity / distribution of any defects
and capabilities to effect a number of parallel repairs or even replacements it
could quite easily lead to the loss of up to 2.3GW of generation on a temporary
or extended basis.
One report I read (I can try and find the link again if needed) stated
that the entire weight of the boiler is borne by the spine, so
repair/replacement may not be straightforward.
I have a feeling these reactors may be out of service for quite some
time, if not condemned altogether.
Rubbish. Whole boiler and pipe assembly could be easily replaced if its
economic.
--
Everything you read in newspapers is absolutely true, except for the
rare story of which you happen to have first-hand knowledge. €“ Erwin Knoll
|