trader_4 wrote:
On Tuesday, May 27, 2014 3:25:41 PM UTC-4, DerbyDad03 wrote:
Oren wrote:

On Tue, 27 May 2014 18:55:20 +0000 (UTC), DerbyDad03


wrote:




A friend is having a heated pool installed. He has a breaker panel outside


near the pool. He was told that per NYS code, the wires that go run through


his basement from the exterior panel to the main panel must be run inside


rigid conduit. He said that they didn't use individual wires, they used


some type of jacketed cable that contains 4(?) wires and they ran that


inside grey plastic conduit. I haven't seen it, but I assume it's Schedule


40 PVC.




Another friend had a heated pool installed last year (also in NYS) and he


said that they didn't use conduit through his basement. They just stabled a


large cable to the joists.




So what's the story? Is the conduit required? If it is, is it specifically


related to the pool or is it because there's another panel involved?




Thanks.




I'm not an electrician so cannot offer advice. I suspect this is


related to 220V, exposed wire and water. My pool wires are in a


specific type of PVC pipe that has water tight fittings. They run


along the outside wall just below ground, the length of the house, to


the pump area. I'm sure the wires are in conduit to prevent any


possible cutting by say a shovel, etc.




I was asking about the wires that run _inside_ the house from where they

enter through the wall and run back to the main interior panel, not the

wires that run underground or from the exterior panel to pump/heater/etc.



There isn't anything in NEC that differentiates how a subpanel for
a pool is connected versus any other subpanel. There is no reason I
know of that says wires for a pool or anything else have to be run
in rigid conduit for a subpanel. Here, NJ, very typical to use
appropriate sized cable to go from the basement panel
to the pool subpanel, on the side of the house. If they had an
existing code compliant subpanel that the pool could run off, no
reason to go rework that with conduit inside the house, which is
what it looks like you;re saying they did.


Sorry if I wasn't clear. He did not have a panel outside the house until
the pool was installed. The panel was installed as part of the pool
installation. At the time the panel was installed, he was told that conduit
was required for the wires from that panel to the main panel.

I can say upfront that he wasn't being ripped off by the installer because
the installer is doing everything he can to save the homeowner some money.
The installer told my friend "if I buy the conduit, I have to mark it up.
Take this list. If all these conduit parts are here when I run the wires,
then I'll use it."