View Single Post
  #23   Report Post  
Posted to uk.d-i-y
Tim Watts[_3_] Tim Watts[_3_] is offline
external usenet poster
 
Posts: 7,434
Default Separate earth wire

On 12/05/14 10:47, wrote:

So its getting its first PAT test at around 80 years old. Methinks
its overdue. That or the next test is due in 2094.

Being something of a museum piece I'd rather not replace the lead, so
adding a CPC may become a long term feature.


Although if the lead is that old (rubber I assume?) is it remotely
serviceable?