Thread
:
Separate earth wire
View Single Post
#
23
Posted to uk.d-i-y
Tim Watts[_3_]
external usenet poster
Posts: 7,434
Separate earth wire
On 12/05/14 10:47,
wrote:
So its getting its first PAT test at around 80 years old. Methinks
its overdue. That or the next test is due in 2094.
Being something of a museum piece I'd rather not replace the lead, so
adding a CPC may become a long term feature.
Although if the lead is that old (rubber I assume?) is it remotely
serviceable?
Reply With Quote
Tim Watts[_3_]
View Public Profile
Find all posts by Tim Watts[_3_]