View Single Post
  #3   Report Post  
Posted to sci.electronics.repair
Peter Easthope Peter Easthope is offline
external usenet poster
 
Posts: 32
Default Warrick Liquid Level Control

On Wednesday, October 9, 2013 11:47:21 AM UTC-7, N_Cook wrote:
Does pilot duty relate to a second, preliminary pump, for clearing air
from the system , priming, before the main pump will cut in?


In this case there is only one pump.

A submersible pump would not require priming unless an air/gaseous block
gets in there


The pump is located at the well head. To my understanding it is a shallow well jet pump as described here.
http://en.wikipedia.org/wiki/Eductor...ump#Well_pumps

Thanks for the reply, ... Peter E.