keeping it level
On Tue, 14 May 2013 11:01:03 -0700 (PDT), Harry K
wrote:
No, after the foundation is level there is no need for a string.
Those blocks are laid dry with no mortar to level them.
Harry K
I'd still have handy level to check the plumb.
Just in case, a string level:
http://gorambling.com/images/building_stuff/tools/string_line_level.jpg
|