Thread: extension leads
View Single Post
  #10   Report Post  
Posted to uk.d-i-y
Andy Burns[_7_] Andy Burns[_7_] is offline
external usenet poster
 
Posts: 2,688
Default extension leads

Dave Plowman (News) wrote:

Two 3 Kw kettles on the same extension should have blown the plug fuse and
quickly.


A 13A fuse is required to carry 1.6x the rated current without blowing,
and only required to blow within 30 minutes for 1.9x rated current, so
whether, or how quickly it should blow, depends on the duty cycle of the
two kettles ...