Thread
:
SIMPLE electrical job. Cost via electrician? chg direct-wire to plug & socket
View Single Post
#
96
Posted to alt.home.repair
[email protected]
external usenet poster
Posts: 18,538
SIMPLE electrical job. Cost via electrician? chg direct-wire to plug & socket
On Mon, 6 Feb 2012 19:31:48 +0000 (UTC),
(David
Combs) wrote:
In article ,
Nate Nagel wrote:
On 02/02/2012 06:16 PM,
wrote:
...
Problem solved!
if you do that make sure the switch is a DPDT center-off switch, or at a
bare minimum break before make. xfmrs can backfeed and that wouldn't be
safe
nate
--
replace "roosters" with "cox" to reply.
http://members.cox.net/njnagel
OK -- long, long ago *I* was a "ham" (but got bored because
all that the people talked about was their equipment. But
of course if I had *designed* and built my own transmitter,
I wouldn't be bored, but fascinated!)
So I know what a DPDT switch is OK.
But what's a "center-off" one?
Or, at bare minimum, a "break before make"? (Well, that one
seems self-evident. Question: aren't ALL dbl-throw switches
break before make? I guess not. Please elaborate.)
Thanks!
David
All NORMAL DPDT switches are break before make - some specialty
switches are make before break. A DPDT "reversing duty" switch HAS to
be break before make
Reply With Quote
[email protected]
View Public Profile
Find all posts by
[email protected]