On Sun, 05 Feb 2012 08:57:08 -0800, Oren wrote:
Along the same lines
Oh yeah. I forgot to mention I'm learning that snapping lines is critical.
So I bought a chalk line and started snapping away.
The edge against the wall is easy to get the runoff slope:
http://picturepush.com/public/7508968
But how do you get the slope away from the wall lined up?
(I snapped a line on the form but I'm positive that form will move as I
jostle it about.)
Note: I used hard plastic tubing for a joint spacer (which I can pull
away while the concrete is wet, I hope).
This should leave a tunnel for water to flow outward if more cracks form
in the connection between the wall and the stone mortar.