View Single Post
  #4   Report Post  
Posted to alt.home.repair
HeyBub[_3_] HeyBub[_3_] is offline
external usenet poster
 
Posts: 11,538
Default Lack of suitable joint spacers is driving me crazy (my 1st flagstone walkway)

Chuck Banshee wrote:
Here is a picture of my current (lousy) attempt at uniform spacers
between flagstones to be set into mortar tomorrow:
http://www4.picturepush.com/photo/a/...mg/7478342.jpg

The board in that picture, placed with the tall side up (instead of
flat as it is in that picture), is still too thick.

Q: What do YOU use to space flagstone while you're cutting the last
piece and when you start mortaring them down?
http://www5.picturepush.com/photo/a/...mg/7478368.jpg

Note: It matters greatly even a little bit because the errors add up
over the 20 or so pieces and you're cutting the last (middle) piece
to fit. http://www4.picturepush.com/photo/a/...mg/7478407.jpg


You can get dowel rods, round or square, in almost any width from 1/16th to
1 inch or more at the box store. I used 4 of 3/8ths-inch to lay ceramic
tile. They worked out FAR better than the little foam crosses.