Which circuit?
On Mon, 16 Jan 2012 22:26:06 -0500, "Ralph Mowery"
wrote:
An electrician friend pulled a power meter to a church. While working on
the wiring, he was shocked very bad. Went out side and someone had put the
meter back in the meter base.
That is why OSHA requires a lock out tag. I can't imagine what the
guy was thinking when he put it back in.
|