View Single Post
  #22   Report Post  
PoP
 
Posts: n/a
Default "Part P in force by 2004"

On Wed, 5 Nov 2003 00:51:53 -0000, "James"
wrote:

Ah! So one legal option (assuming it is not a kitchen) is to do the work
and then get a member of a SCAM organisation to certify it. Is there going
to be any maximum time between doing the work and employing the SCAM member?
If not we can legally have a large backlog of jobs to be inspected - and
until we sell the house never get round to having it certified!


The possible issue with this arrangement would be that if there were
an accident or fatality between the job being done and the house
eventually being sold then the lack of certification could land the
person who did the job in very hot water.

PoP