Thread: lumberwaiter
View Single Post
  #16   Report Post  
Posted to rec.crafts.metalworking
David Lesher David Lesher is offline
external usenet poster
 
Posts: 669
Default lumberwaiter


The crane idea would need two folks to run, one on top, one below.

The attraction of the lead screw is that if/when something fails;
it will not plummet as a broken cable lift would.

I agree the umph of most door openers, but how much CAN they lift?

With the pipe, I think I could anchor it with a arm from the house; that would
provide some stability.

We have a good supply of thickwall ~1.5" sq tube, as seen on stuff here http://2.ly/p9sp
I seem to recall a long length of it; but how would the scuttle be built
to slide along it?


--
A host is a host from coast to
& no one will talk to a host that's close........[v].(301) 56-LINUX
Unless the host (that isn't close).........................pob 1433
is busy, hung or dead....................................20915-1433