Thread: FIT slashed
View Single Post
  #339   Report Post  
Posted to uk.d-i-y
Tim Lamb[_2_] Tim Lamb[_2_] is offline
external usenet poster
 
Posts: 6,938
Default FIT slashed

In message
, cynic
writes
On Oct 31, 4:18*pm, "Dave Liquorice"
wrote:
http://www.bbc.co.uk/news/business-15507750

Down to 21p/kWHr for installations completed after 12th Dec 2011.

--
Cheers
Dave.


Fascinating planning application floated across the table for comment
at last nights Parish Council meeting. A local farm wants to put a
large system on top of an agricultural building and therefore not
permitted development. The application was submitted by the
installation company and consisted of a large number of panels on the
South facing slope of the roof PLUS another array on the NORTH slope.
Methinks someone is going to get their eyes opened if the application
is passed and the installation goes ahead! Of course there is a vast
difference between putting in an application and completing the
installation.


Agricultural roof pitches can be 12.5 or 15deg.

regards

--
Tim Lamb