What is the accepted way to extend the incoming main? Henley blocks
or something more substantial?
It must be a single continuous cable, no Henley blocks or similar
as they are points where unmetered electricity can be taken from.
To comply with your electricity supply contract who-ever moves
your meter "must":
"Should" may be a better word.
Indeed. Without red tape, everything is 10 times easier and 10 times cheaper. It's why the UK is so far behind.
--