Default I need a supply house in Australia for CNC-type toolholders...

"Michael A. Terrell" on Wed, 21 Sep 2011
23:29:24 -0400 typed in rec.crafts.metalworking the following:

Pete Keillor wrote:

Michael A. Terrell wrote:

Would the downtime have been cheaper, and still let them meet
shipping schedules? If so, he should have set a limit.


Yeah, it was a pilot plant, not production, his mistake. The
production plants make one rail car (175,000 lb.) per hour per train,
so their down time is considerably more expensive.



Then it was the boss's fault for not setting a dollar limit. So much
for setting up the proper 'Standards and Practices' ahead of time.


He said "up by Monday" - it was up by Monday. His wish was their
command. Feces Occurs.


pyotr

--
pyotr filipivich
We will drink no whiskey before its nine.
It's eight fifty eight. Close enough!