View Single Post
  #45   Report Post  
Posted to rec.woodworking
Bill[_41_] Bill[_41_] is offline
external usenet poster
 
Posts: 283
Default EMT Design Question

Mike Marlow wrote:

That's not what I was referring to Bill. I was talking about all of the
fuss (if I understood it correctly) with hitting a flush mount box while
also having surface mount boxes right there as well. It seemed to me that
you were trying to make too much of the job by trying to get conduit into
the flush mount.




Mike,

Your earlier comments made me think a little more. See if you think the
following idea makes things easier/better:

I could just bend one piece of EMT to run from the switchbox, up the
stud, and finish with a 90 degree bend coalescing with the ceiling,
attaching one those C-type EMT connectors to the end. This eliminates
the "middle" box in my earlier drawing (so no surface-mount boxes).

What do you think; pretty good, no? There's power in numbers (working
together)!

Bill