Thread: painting day
View Single Post
  #1   Report Post  
Posted to rec.crafts.metalworking
Karl Townsend Karl Townsend is offline
external usenet poster
 
Posts: 3,286
Default painting day

I'm waiting for paint to dry on my CNC knee mill project. So, I took
some pics.

http://www.metalworking.com/dropbox/..._knee_left.JPG

http://www.metalworking.com/dropbox/...knee_right.JPG

The first two pics show air cylinders built from scratch to counter
the knee's weight. I meant to take a pic of the parts before assembly
but forgot.

http://www.metalworking.com/dropbox/...lift_parts.JPG

This pile o' parts will become the ball screw lift assembly that
replaces the old acme hand lift on the knee mill.

If there's no ah **** tommorrow, I should get the mill back together.

Karl