On 6/3/2011 1:46 PM, dpb wrote:
....

OK, I found the annual meeting minutes program I was looking for--

....
In there the current estimated construction costs are--

Coal $2500-$2600 /MWe
Nuke $5000-$5200 /MWe
Wind $2400-$2500 /MWe (including tax credits)

The kicker is that w/ wind we can only expect roughly 40% of that
installed capacity to be available (on annual capacity of 112 MWe
installed observed over nine years of actual production) so the actual
average installed cost is roughly 2.5X the above or $6000 /MWe-ongrid.

....

BTW, just for comparison--for the time period the overall average
capacity factor for Wolf Creek Nuclear Station was 87.1% w/ a peak
annual capacity of 95.8% in '07; the _lowest_ being 81.5% in '05 owing
to an extra week (roughly) longer outage duration costing roughly 2% on