Converting CH to C plan or something else ... a few questions
Hi David
David WE Roberts wrote:
[lots of good stuff snipped, thanks]
You may be 'polishing a turd' if you just modify the pipework without
confirming that the hot water tank is functioning correctly.
fair point, well made. In some ways I would like a stop gap until the back
boiler needs replacing and we (probably) re-do with a new boiler in the
loft. I'm conscious that my plans are probably over-ambitious for this
stopgap situation. I *really* don't want to take the tank out though ;-(.
Hmm...
Cheers
J^n
|